After replacing the Y-axis belt, resonance compensation and leveling need to be performed again.
S2.0 Allen key*1
S2.5 Allen key*1
1. If there is a hot bed heating, wait until the temperature of the hot bed drops below 30 degrees.
|
2.Turn off the power
|
1. Remove the magnetic board
|
2. Use the S2.0 allen key to remove the screws that fix the hot bed.
|
3. Place the isolation posts and screws in place
|
1. Completely remove the Y-axis tensioner adjustment knob
|
2. Use the S2.0 allen key to unscrew the fixing screw that fixes the Y tensioner
|
3. Remove the Y-axis tensioner housing
|
Remove the timing belt outwards
|
 |