After replacing the Y-axis motor bracket, vibration compensation and automatic leveling need to be performed again.
●S2.0 Allen key
●S2.5 Allen key
●S3.0 Allen key
●S4.0 Allen key
①Remove the spring steel plate.
②Use the S2.0 Allen key to remove the screws that fix the hot bed.
③Put the isolation column and screws in place
①Turn the Y-axis tensioner counterclockwise to loosen the belt.
②Remove the synchronous belt outward
①Unplug the motor connection wire downward
②Use the S2.5 Allen key to unscrew the four screws that fix the motor, and then remove the motor.
①Use S3.0 or S4.0 Allen key to unscrew the screws of the bracket and replace the motor bracket.
②Pass the belt through the bracket hole, and then use the wrench to re-fix the new bracket.
①Connect the Y-axis motor wiring
②Place the motor on the bracket, and then use the S2.5 Allen key to tighten the four screws that fix the motor.
①Pass the other end of the synchronous belt through the motor fixing hole.
②Re-insert the belt buckle into the hot bed bracket.
①Align the isolation column hole with the hot bed bracket screw hole.
②Align the hot bed hole with the isolation column, and tighten the fixing screw with the S2.5 Allen key.
③Place the spring steel plate.
If the above steps do not provide assistance or if you encounter any other issues during subsequent use, we recommend that you create a support ticket.
The after-sales engineers will assist you in finding a solution to the problem(Reply time :1 working day)
Please click this link to submit your ticket: