Return the filaments inside the print head to ACE Pro, then pull out the four teflon tubes.
(1) Use the S1.5 Allen key to unscrew the two screws holding the print head cable, and then remove the print head cable.
(2) Use the S2.5 Allen key to unscrew the four screws holding the print head module and remove them from the support.
Clean the left and right diagonal tie rod, and then remove the cleaned diagonal tie rod.
(1) Pull the X-axis to the top, move the X-axis module to the middle, and unplug the motor line at the end of the X-axis
(2) Then unplug the left and right end of the Z-axis motor wire
Finally, remove the display cable, then loosen the two screws holding the display, and remove the display.
(1) Raise the gantry frame to the top, tighten and cut off the two cable ties on the left and right sides after they are flush with the screws, put small cable ties into the X-axis end, and then fix the foam.
(2) Loosen the screws on the left and right sides of the gantry frame, turn it over and place it on the hotbed assembly as shown in the figure below.
(3) The hotbed foam is stuffed into the hot bed, so that the hot bed is flush with the motor, and then the motor line on the left and right sides is arranged into the profile internal test.
(1) Take out the print head foam, put the print head module into the flat pocket and put it in the specified position, and then put the display screen and the material rack.
(2) Place the black pearl cotton as shown in the figure, and then load the assembled print head foam component, paying attention to the direction of the notch.
(1) Put the packed gantry frame into the foam that has been packed in the carton, and then put the left and right sides into the foam. Then load the print head line and the motor cable, and put the left and right oblique tie rod into the specified position.
(2) Put the tool kit and power cord in the designated position, then cover the cover, and put the instructions and installation and debugging instructions.
(3) Finally, please use transparent tape to seal the carton, and the machine packaging is completed.